top of page
Engineer Checking Rails

Projects & Cases

Empty Subway Station

Attiko Metro Line 3

Extention of the line. Section: Aigaleo - Piraeus

Visual inspection of all buildings and structures within the influence zone of the project

containerTerminal.png

Container Terminal

Fire investigation - Claim handling

Investigtion of fire & explosion incident regarding a substation for supplying power to reefer containers

pressureVesselExplosion.jpg

Pressure Vessel

Explotion of pressure vessel

Investigation of an incident regarding a vessel explosion resulting to major damages and personnel injuries

railwayCatenarySystem.jpg

Railway Electrification

Damages to multiple catenary systems

Investigation of multiple incidents of damaged wires and other components of catenary systems

Inside the Subway Station

Attiko Metro Line 4

Section: Goudi - Alsos Veikou

Visual inspection of all buildings and structures within the influence zone of the project

istock-466247495_agafapaperiapunta.jpg

Wind Turbines

Weather damage to wind turbines

Investigation of extreme weather incident that caused damages to wind turbines blades

solarSubstationFire.jpg

Solar Power Plant

Fire in the substation of the plant

Investigation of an incident regarding the inverter that caused the fire damages to the plant. Cause investigation, repairs evaluation, loss of profit

cableReels.jpg

Product Liability

Cables' insulation material

Defective material additive during production of cables 